| Design |
Mitsubishi MD T76J 3-leg self-elevating cantilever type drilling rig |
| Hull Length |
59 m |
| Hull Breadth |
56 m |
| Hull Depth |
6.58 m |
| Max. Variable Load |
2,650 tons while drilling with 45 ft. overhang |
| Max. Operating Water Depth |
92 m |
| Max. Drilling Depth |
6,000 m with 5" DP |
| Displacement |
8,720 tons |
| Quarters |
99 beds |
| Class |
NK, IMO MODU A414 |
| Ship Registration |
Panama |
| Construction Yard |
Hiroshima Shipyard & Engine Works, Mitsubishi Heavy Industries, Ltd. |
| Date of Construction |
March 1981 (legs extended in December, 1998) |
| Drawworks |
NATIONAL / 1320-UE |
| Mud Pumps |
NATIONAL / 12-P-160 x 2 |
| Top Drive |
VARCO / TDS-4H |
| BOP |
13-5/8" / 10K BOP Stack |
| Engines |
Niigata Diesel / 12V22AX x 4 |
| Electricity Generators |
Mitsubishi Electric / CFC x 4 |
| Anchors |
Mitsubishi Electric Anchor Winch x 4, MOOR FAST Type Anchor (4 tons) x 4 |
| Total Leg Length |
128.38 m |
| Jacking System |
Rack & pinion type jacking system designed by MHI with a speed of 1 ft./min. |